You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Saluran Air di Jalan Kerinci VIII Rampung Pekan Ini

Water Channel Construction on Jalan Kerinci VIII to Complete Soon

The construction of water channel on Jalan Kerinci VIII, RT 08/02, Gunung Urban Village, Kebayoran Baru District, South Jakarta is about to complete soon.

to complete this week

Kebayoran Baru District's Water Resource Unit Head, Sutopo said water channel construction aims to anticipate inundation during rainy season in the area.

"We also aim preventing inundation in other areas. The work is targeted to complete this week," he said, Tuesday (7/22).

Water Channel Repair on Pari Island to Complete Wednesday

Sutopo explained the channel is constructed along 50 meters by using u-ditch. The work has been running since early July 2025 by involving one excavator with six personnel.

"Hopefully this channel will be able to flow the water smoothly," he added.

Meanwhile, one of the residents, Leo (53) appreciated the project. Le stated that the local residents will be safer since the channel is completed with cover.

"It's the right way to anticipate inundation," he admitted.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close